New home construction

Your Home, Built on a Schedule You Can See.

Custom and semi-custom homes built stage by stage. You always know where your build is, what it costs, and what happens next.

Why building with JAKS is different

Most of what goes wrong on a home build is a scheduling problem.

Not a craftsmanship problem. Trades stack up, a long-lead item never got ordered, and the finish date slips a month at a time without anyone saying so. We build against a defined stage plan with a gate at every handoff, which is why our clients can tell you what week their house is in.

What we build

New construction, residential scale.

A custom home under construction by JAKS Construction, sided and roofed

Custom Homes

Built from your plans or designed with you from the ground up. Every selection, every dimension, and every detail decided before we break ground rather than negotiated mid-build.

Interior of a newly built semi-custom home with custom cabinetry

Semi-Custom Homes

Start from a proven plan and change what matters to you. You get the cost certainty of a known layout with the finishes and cabinetry made for your family.

Finished barndominium with a standing seam metal roof on a Kansas property

Barndominiums and Metal Homes

Steel framed homes and shop-house combinations. Durable, efficient, and finished to residential standards on the inside, not just a shell with rooms in it.

A JAKS Construction multifamily building under construction with scaffolding in place

Multifamily and Small Residential Developments

Duplexes, fourplexes, and small multifamily projects. We bring commercial-grade scheduling and cost control to residential-scale construction.

The build

Thirteen stages from first conversation to keys.

Every stage has to clear its gate before the next one starts. That is the whole reason the schedule holds.

  1. 0

    Lead and feasibility

    Lot, budget range, and whether the project pencils. We tell you early if it does not.

  2. 1

    Design

    Plans developed to the point where they can actually be priced and permitted.

  3. 2

    Permit and pre-mobilize

    Permits pulled, trades booked, long-lead items ordered before anyone shows up on site.

  4. 3

    Sitework

    Clearing, grading, utilities, and the pad your house sits on for the next hundred years.

  5. 4

    Foundation

    Footings, foundation, and slab, inspected before anything covers them.

  6. 5

    Framing and structure

    Framing, roof structure, and the first time the house looks like a house.

  7. 6

    Envelope

    Roofing, windows, doors, and exterior finish. The building gets dried in.

  8. 7

    MEP rough-in

    Mechanical, electrical, and plumbing trades roughed in under our coordination and inspected while the walls are still open.

  9. 8

    Insulation and drywall

    Insulation, board, tape, and texture. The rooms become rooms.

  10. 9

    Interior finish

    Cabinetry from our own shop, trim, doors, flooring, and paint.

  11. 10

    Fixtures and appliances

    Plumbing fixtures, lighting, hardware, and appliances set and tested.

  12. 11

    Site finish

    Drives, flatwork, grading, and landscape so the outside matches the inside.

  13. 12

    Closeout and CO

    Final inspections, certificate of occupancy, punch list closed, and keys in your hand.

The JAKS difference

What you get that you would not get elsewhere.

JAKS Construction team members working together on a job site
  • You always know what stage you are in

    Thirteen defined stages, each with a gate that has to be met before the next one starts. No vague "we are getting there" updates.

  • Cabinetry and millwork are not a bottleneck

    Interior finish is where most builds stall waiting on cabinets. Ours are built in our own Wichita shop on your schedule.

  • A payment schedule tied to real progress

    Draws are tied to completed stages, not to a calendar. If you are financing through a lender, we work inside their draw process.

  • Built for Kansas code and Kansas weather

    We build to the local code stack every day and we sequence around Kansas seasons instead of getting surprised by them.

Members of the communities we build in

  • Wichita Area Builders Association
  • National Association of Home Builders
  • Wichita Regional Chamber of Commerce
  • Wichita Independent Business Association
  • Andover Area Chamber of Commerce
  • Wellington Area Chamber of Commerce
  • Derby Chamber of Commerce

Frequently Asked Questions

How long does it take to build a custom home in Wichita?

Most custom homes take several months to a year depending on size, weather, and selections. We run every build on a defined 13 stage schedule with clear gates, so you always know exactly which stage your home is in and what has to happen before the next one starts.

How does the permit process work?

We submit through the MABCD portal on your behalf. Residential plan review in Sedgwick County is fast compared to most metros, and the permit is valid for 180 days from issuance. Septic, driveway, and floodplain requirements can add steps on rural lots, and we flag those before you commit to a property.

What inspections does my home go through?

MABCD enforces the 2018 International Residential Code inspection sequence: footing and foundation, slab or under-floor, rough mechanical and framing, drywall, and a final inspection that issues your Certificate of Occupancy. You cannot move in until the CO is issued, and we schedule every inspection as part of the build.

What is the difference between custom and semi-custom?

A custom home starts from your requirements and a clean sheet. A semi-custom build starts from a proven plan and lets you tailor finishes, cabinetry, and select layout changes, which saves design time and cost. We build both, and we will tell you honestly which fits your budget and timeline.

Can you help me find or evaluate a lot?

Yes. Before you close on land we check zoning, platting, utilities, septic requirements, floodplain status, and driveway access, because any one of those can delay a permit or add real cost. It is much cheaper to learn that before you buy the lot than after.

How is the build priced and financed?

We work with several contract structures and with lender-financed builds, including draw schedules tied to construction milestones. The right structure depends on your financing and how much flexibility you want during the build; we lay out the options in plain terms before you sign anything.

Do you build barndominiums and metal homes?

Yes. We build barndominiums and metal-frame homes on the same gated schedule and permit process as our conventional builds, with the same cabinetry from our own millwork shop inside.

What Wichita Says About Us

From beginning to end, JAKS Construction was excellent! They took all my inspiration pics and turned them into one beautiful, cohesive design that adds functionality and style to our home! Every detail was meticulously handcrafted and it shows! We will go to JAKS for all of our renovation needs!
M.F.Pantry remodel and custom cabinetry
Good communication and reliable services
C.D.Construction management
Great experience, Good crew to replace aging windows. Very communicative, on time and exceeded expectations.
D.S.Window replacement

Read all our reviews on Google

Start your project

Ready to start your build?

Tell us about your lot, your plans, or just the idea you have been sitting on. We will respond within one business day with an honest read on feasibility and budget.

Visit
5025 E Kellogg Dr., Wichita, KS 67218
5.0Google Reviews

Tell us about your project

All fields help us give you a faster, more accurate answer.

Prefer to talk it through? Call (316) 749-8199 or email info@jaks.construction.

Call JAKS Construction at (316) 749-8199Free Estimate